House construction

Home page -  House construction

Flexibuild company cooperates with some other construction companies in the field of building industry. Our cooperating companies are continuously trained in the Flexibuild construction system and have all necessary certificates to be able to use Flexibuild products. In tThis way we are able to guarantee the quality of construction (the house is made according to the design documentation, includes all standard equipment, and proper building procedure is followed). Constructed obtains the Flexibuild certificate and the owner receives a house identification number.

All-in contract houses can be built within 3 months. The construction is not dependent on weather. Due to a small amount of used materials, small space for storage is needed. Sandwich panels are storeyed on the foundation slab and the house is constructed around the storage place. Individual elements are easily manipulated by hand and no cranes or lifting devices are necessary.

HOW CAN WE HELP YOU?

BUILDING PREPARATION

  • Planning studies
  • Architectural design
  • Design documentation

BUILDING REALIZATION

  • Selection of a suitable construction company
  • Construction supervision
  • Securing different services are provided
  • Technical consultations concerning the building

HOUSE OPERATIONS

  • Customer service
  • Testing of house parameters (thermovision, air-tightness, energy consumption)
  • Consultations during house adjustments, or lay-out changes